China Steel Industry of residence should enter 2.0 years on behalf of the

Time:[2015-12-9]  Hits:4579

China Steel Industry of residence should enter 2.0 years on behalf of the


 
Domestic civil engineering applications in housing construction in most reinforced concrete, steel shelter in the field to carry out relatively slowly. The international experience shows, steel homes have more advantages, so advance in the area of ​​residence of the steel structure to carry out, to bring both national excellent quality seismic performance good shelter, it is to regulate the Institute has been doing. Guangzhou Steel

China Steel to carry out the bottleneck is mainly from the developer to control costs, in addition to an indoor acoustic steel shelter, insulation, system integration is not complete and other downwind, but if the subject of industrialization and built industrialization linked downwind available resolve, it is recommended that steel enterprises steel shelter during the promotion, be sure to contact the main industrialized and industrialized built up, this can make the steel structure to achieve the effect of weaknesses in the area of ​​residence. This is the norm hospital claims to be the residence of steel building function, built-in system linked. Guangzhou Steel
Current Situation

Currently, the share of China's domestic steel stay relatively small, steel shelter to carry out quite a long time, but for early steel shelter is to be converted into steel concrete structures to do, this is a big misunderstanding. Traditional steel shelter "heavy construction, light construction, no built-in," and there is a large quantity of steel, beams indoor convex, building function is imperfect and the degree of standardization is not high shortcomings. To overcome these shortcomings, technical specifications hospital with the idea: open structure, envelope, collaborative planning system built three generations of 2 2.0 years. 2 2.0 years on behalf of the three basic principles of steel shelter undertaken:

In building function as the core, construction planning to meet the housing function, provide high-quality application experience. Subject to the framework for the unit to start the network as much as possible consistent column width and depth, size and function of the layout plan should consider setting the lateral force resisting member, perform spatial reasonable variable.

Structural arrangement is based on the selection of proven architecture, optimized to meet the construction steel is arranged in the function of the premise, it is necessary to meet the large space layout requirements, but also to strictly control costs, while reducing the difficulty of construction, and contact the interior solve Steel protection issues.

In industrialized envelope and interior parts for support, contact conditions with overseas experience, choose the appropriate envelope system with the main structure and interior systems cooperate in ensuring basic safety performance, while achieving the rain, insulation, ventilation, noise, etc. function requirements; through the rational planning can hide indoor interior steel beams, steel columns, support and other structural members, complete fire, corrosion integration effect, and reduce the cost.

The traditional residence of planning is not the same, steel shelter 2.0 is more interactive collaborative planning system. Including the following ten overall collaborative planning: Anti-side system units and collaborative planning, collaborative planning facade and building envelope systems, pipeline system and anti-lateral collaborative planning system, pipeline system and floor system collaborative planning, collaborative pipeline system and containment system planning, building envelope systems and fire collaborative planning, building envelope system with built-in collaborative planning, building envelope systems and collaborative planning floor system, built with fireproof collaborative planning, interior and floor system of collaborative planning.

In short, steel shelter 2.0 is the only way to carry out the steel structure residence industrialization is an important direction to complete the construction industry chain upgrading. Specification hospital bears the livelihood of social responsibility, it will also be determined in advance of the Chinese steel industry into the residence 2.0 years generations. Guangzhou Steel